Bored pile — Semarang

MD Residence

Bored pile foundation for MD Residence in Semarang: 77 piles in total, completed in 28 working days.

The site is stepped and tight, hemmed in by retaining walls and neighbouring houses. The rig had to be repositioned to follow each step, and every move meant checking the platform again — on sloping ground, a rig that is not level puts the pile out of plumb immediately.

The ground is full of rock and boulders, so drilling was carried out with a core barrel to cut through the hard layers. It is slower per pile, but it is the only way to reach the design depth without damaging the hole.

Drilling equipment working beside a retaining wall at the MD Residence site in Semarang, with workers nearby
Fig. 01 — Drilling beside the retaining wallSemarang
Bored piles
77 piles
Duration
28 working days
Method
Core drilling
Ground
Rock & boulders
Terrain
Stepped site
Location
Semarang

On site

Semarang
Aerial view of the stepped MD Residence site with two machines working between retaining walls and houses
Fig. 02 — The stepped site from aboveSemarang

Other Projects

Field track record

Discuss your requirements

Not sure which foundation method suits your site? Just describe the conditions — our engineering team is glad to help, with no obligation.

WhatsApp: +62 811-902-590 Download Company Profile PDF · 3 MB
Office
Ruko Asia Tropis blok AT12 no. 21, Kota Harapan Indah, Bekasi Regency, Indonesia
View on Google Maps →
Opening Hours
Monday–Friday 10:00–17:00 WIB (UTC+7)
Saturday 10:00–12:00 WIB
Closed on Sundays and public holidays
Office Phone
+62 21 8889 8292
WhatsApp / Mobile
+62 811-902-590