Every bored pile logged, right at the borehole
Our drilling and concreting logs are entered on a phone beside the borehole, not copied from paper back at the office. The numbers the project owner and the main contractor receive are the numbers measured at the hole.
We built the system ourselves. It is called TerraBot, and it runs on our projects every day.
Office and phone views — sample data, interface in Indonesian
What Is Recorded per Pile
Traceable one by oneDaily reports and pile summaries come from the same data, not retyped.
Pour Report, Instantly
On your phone the same dayFrom the borehole to your screen, the same day.
During the pour
The office and the engineers see the work as it happens, including the borehole section and the concrete level.
As soon as it is done
The effective concrete diameter for each truck is calculated from the volume and the soundings. The result is a single pile profile image.
The same day
The image can be shared straight away. Any indication of necking or bulking is already visible.
The limit
This is a field measurement, not a test. It is a flag for caution, not a replacement for PIT testing.
Illustrative message — sample data, image text in Indonesian
Discuss your requirements
Not sure which foundation method suits your site? Just describe the conditions — our engineering team is glad to help, with no obligation.
WhatsApp: +62 811-902-590 Download Company Profile PDF · 3 MBSaturday 10:00–12:00 WIB
Closed on Sundays and public holidays
