Bored pile — Semarang

Bukit Sari Residence

Bored pile foundations for the Bukit Sari residence on a hillside in Semarang. 39 drilled piles in total, with drilling completed in eight working days in September 2021.

Piles of Ø 800 mm (main bars 14D19, spiral D10-150) and Ø 1,000 mm (20D19, spiral D10-125), with effective lengths of about 12–15 metres, K-300 concrete, tied together by pile caps at the pile heads.

The challenge was the ground: silty clay mixed with boulders along the full depth of the holes, on a sloping site that had been excavated first. Before production began, a trial bore confirmed the method and equipment; after that, every pile was logged in its own piling record.

Drilling rig and excavator on the excavated site at Bukit Sari Residence, Semarang
Fig. 01 — Bored pileSemarang
Drilled piles
39 piles
Diameter
Ø 800 & 1,000 mm
Effective length
±12–15 m
Main reinforcement
14D19 · 20D19
Concrete grade
K-300
Period
September 2021

On site

September 2021
Drilling rig working beside a retaining wall and houses at Bukit Sari, Semarang
Fig. 02 — Rig on the slopeSemarang

Other Projects

Field track record

Discuss your requirements

Not sure which foundation method suits your site? Just describe the conditions — our engineering team is glad to help, with no obligation.

WhatsApp: +62 811-902-590 Download Company Profile PDF · 3 MB
Office
Ruko Asia Tropis blok AT12 no. 21, Kota Harapan Indah, Bekasi Regency, Indonesia
Opening Hours
Monday–Friday 10:00–17:00
Saturday 10:00–12:00
Closed on Sundays and public holidays
Office Phone
+62 21 8889 8292
WhatsApp / Mobile
+62 811-902-590